Birds Eye Factory Suffolk - Noxyde

AFTER

BEFORE

Description

The Birds Eye factory was built in 1985 in Suffolk next to the North Sea. The sea air had caused extensive corrosion to the roof sheets, gutterings and edge laps. The roof at the factory was 8,000sqm, and the project took 3 months to complete.

Parts of the factory were also suffering badly from rust and showing signs of extensive corrosion. This large industrial steel framework, protects and supports the main services that are vital to keep the factory running. Over 100 linear meters of steel housing for power lines, gas pipes, water supply pipes, ammonia pipes and more.

Project size

8000 m²

Country

United Kingdom

Main products

9100 Anti-Corrosive Epoxy Rust Primer

9200 twin pack polyurethane topcoat

Noxyde

Year

2019

Distributor

Kent Blaxill

www.kentblaxill.co.uk

Applicator

www.cladspraysolutions.co.uk